[1]
Triatmojo, M.A. et al. 2025. EVALUASI PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PELAT LANTAI KONVENSIONAL DAN BONDEK DENGAN METODE CRITICAL PATH METHOD: COMPARATIVE EVALUATION OF THE COST AND TIME OF CONVENTIONAL FLOOR SLAB AND BONDEK WORK USING THE CRITICAL PATH METHOD. CONCRETE: Construction and Civil Integration Technology. 3, 02 (Oct. 2025), 120–125. DOI:https://doi.org/10.25139/concrete.v3i02.10997.