[1]
Asghori, I., Kusnul Yakin and Maulidya Octaviani 2023. Analisa Manajemen Waktu Dan Biaya Pada Proyek Modernisasi Pabrik Gula Dengan Menggunakan Metode Nilai Hasil: Analysis of Time and Cost Management in the Sugar Factory Modernization Project Using the Yield Value Method. CONCRETE: Construction and Civil Integration Technology. 1, 01 (May 2023), 7-14. DOI:https://doi.org/10.25139/concrete.v1i01.6167.