[1]
Basyri, S., Octaviani, M., Rizki Astri and Ayu, S. 2024. Analisis Percepatan Pembangunan Ruko 3 Lantai Menggunakan Metode CPM DAN PERT (Studi Kasus: Ruko Perumahan Heavenland Park Sidoarjo): ANALYSIS OF ACCELERATE CONSTRUCTION OF 3-STORY SHOP USING CPM AND PERT METHODS. CONCRETE: Construction and Civil Integration Technology. 2, 01 (May 2024), 1-10. DOI:https://doi.org/10.25139/concrete.v2i01.7987.