[1]
cendana, G. wahyu candrika, Abiarto, W. and Apriliani, R.A. 2024. Analisis Percepatan Proyek Untuk Meningkatkan Efisiensi Waktu Dan Biaya Dengan Menggunakan Metode Crashing: Project Acceleration Analysis To Improve Time And Cost Efficiency Using Crashing Method. CONCRETE: Construction and Civil Integration Technology. 2, 02 (Nov. 2024), 157-166. DOI:https://doi.org/10.25139/concrete.v2i02.8735.