(1)
Triatmojo, M. A. .; Apriliani, R. A. .; Abiarto, W.; Octaviani, M. EVALUASI PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PELAT LANTAI KONVENSIONAL DAN BONDEK DENGAN METODE CRITICAL PATH METHOD: COMPARATIVE EVALUATION OF THE COST AND TIME OF CONVENTIONAL FLOOR SLAB AND BONDEK WORK USING THE CRITICAL PATH METHOD. CONCRETE 2025, 3, 120-125.