Saputro, A., Kusnul Yakin, & Maulidya Octaviani. (2023). Analisis Percepatan Proyek Serta Pengaruhnya Terhadap Waktu Dan Biaya Menggunakan Metode Critical Path Method (CPM): Analysis of Project Acceleration and Its Effect on Time and Cost Using the Critical Path Method (CPM). CONCRETE: Construction and Civil Integration Technology, 1(01), 27-36. https://doi.org/10.25139/concrete.v1i01.6166