Asghori, I., Kusnul Yakin, & Maulidya Octaviani. (2023). Analisa Manajemen Waktu Dan Biaya Pada Proyek Modernisasi Pabrik Gula Dengan Menggunakan Metode Nilai Hasil: Analysis of Time and Cost Management in the Sugar Factory Modernization Project Using the Yield Value Method. CONCRETE: Construction and Civil Integration Technology, 1(01), 7-14. https://doi.org/10.25139/concrete.v1i01.6167