Wahyuni, N., Kusnul Yakin, & Maulidya Octaviani. (2023). Analisis Perbandingan Biaya Dan Waktu Antara Kosntruksi Baja Dan Beton (Studi Kasus : Proyek Pergudangan Logistik Mako Ksatrian Yon 1 Marinir Gedangan Sidoarjo): Cost And Time Comparison Analysis Between Steel And Concrete Construction (Case Study: Mako Ksatrian Battalion 1 Marines Gedangan Sidoarjo Logistics Warehousing Project). CONCRETE: Construction and Civil Integration Technology, 1(01), 70-75. https://doi.org/10.25139/concrete.v1i01.6172