Pamungkas Putra, E., Sujatmiko, B., & Octaviani, M. (2024). Analisis Percepatan Proyek Menggunakan Metode Crashing (Studi Kasus Proyek Gedung Kontrol Gardu Induk 150Kv Blimbing Baru 2021): Analysis of Project Acceleration Using the Crashing Method (Case Study of the 150Kv Blimbing Baru 2021 Main Substation Control Building Project). CONCRETE: Construction and Civil Integration Technology, 2(02), 207-212. https://doi.org/10.25139/concrete.v2i02.8227