SAPUTRO, A.; KUSNUL YAKIN; MAULIDYA OCTAVIANI. Analisis Percepatan Proyek Serta Pengaruhnya Terhadap Waktu Dan Biaya Menggunakan Metode Critical Path Method (CPM): Analysis of Project Acceleration and Its Effect on Time and Cost Using the Critical Path Method (CPM). CONCRETE: Construction and Civil Integration Technology, v. 1, n. 01, p. 27-36, 25 May 2023.