Basyri, Saiful, Maulidya Octaviani, Rizki Astri, and Sekar Ayu. 2024. “Analisis Percepatan Pembangunan Ruko 3 Lantai Menggunakan Metode CPM DAN PERT (Studi Kasus: Ruko Perumahan Heavenland Park Sidoarjo): ANALYSIS OF ACCELERATE CONSTRUCTION OF 3-STORY SHOP USING CPM AND PERT METHODS”. CONCRETE: Construction and Civil Integration Technology 2 (01), 1-10. https://doi.org/10.25139/concrete.v2i01.7987.