Saputro, A., Kusnul Yakin and Maulidya Octaviani (2023) “Analisis Percepatan Proyek Serta Pengaruhnya Terhadap Waktu Dan Biaya Menggunakan Metode Critical Path Method (CPM): Analysis of Project Acceleration and Its Effect on Time and Cost Using the Critical Path Method (CPM)”, CONCRETE: Construction and Civil Integration Technology, 1(01), pp. 27-36. doi: 10.25139/concrete.v1i01.6166.