Basyri, S., Octaviani, M., Rizki Astri and Ayu, S. (2024) “Analisis Percepatan Pembangunan Ruko 3 Lantai Menggunakan Metode CPM DAN PERT (Studi Kasus: Ruko Perumahan Heavenland Park Sidoarjo): ANALYSIS OF ACCELERATE CONSTRUCTION OF 3-STORY SHOP USING CPM AND PERT METHODS”, CONCRETE: Construction and Civil Integration Technology, 2(01), pp. 1-10. doi: 10.25139/concrete.v2i01.7987.