[1]
M. A. . Triatmojo, R. A. . Apriliani, W. Abiarto, and M. Octaviani, “EVALUASI PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PELAT LANTAI KONVENSIONAL DAN BONDEK DENGAN METODE CRITICAL PATH METHOD: COMPARATIVE EVALUATION OF THE COST AND TIME OF CONVENTIONAL FLOOR SLAB AND BONDEK WORK USING THE CRITICAL PATH METHOD”, CONCRETE, vol. 3, no. 02, pp. 120–125, Oct. 2025.