[1]
S. Basyri, M. Octaviani, Rizki Astri, and S. Ayu, “Analisis Percepatan Pembangunan Ruko 3 Lantai Menggunakan Metode CPM DAN PERT (Studi Kasus: Ruko Perumahan Heavenland Park Sidoarjo): ANALYSIS OF ACCELERATE CONSTRUCTION OF 3-STORY SHOP USING CPM AND PERT METHODS”, CONCRETE, vol. 2, no. 01, pp. 1-10, May 2024.