Basyri, Saiful, et al. “Analisis Percepatan Pembangunan Ruko 3 Lantai Menggunakan Metode CPM DAN PERT (Studi Kasus: Ruko Perumahan Heavenland Park Sidoarjo): ANALYSIS OF ACCELERATE CONSTRUCTION OF 3-STORY SHOP USING CPM AND PERT METHODS”. CONCRETE: Construction and Civil Integration Technology, vol. 2, no. 01, May 2024, pp. 1-10, doi:10.25139/concrete.v2i01.7987.