[1]
2025. Perencanaan Ulang Pada Jembatan Flyover Aloha Sidoarjo Dengan Menggunakan Concrete Segmental Box Girder Di STA 0+420 – STA 0+450: Case Study of the Aloha Flyover Bridge in Sidoarjo at STA 0+420 – STA 0+450. Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil. 8, 2 (Sep. 2025), 111–116. DOI:https://doi.org/10.25139/jprs.v8i2.10773.