[1]
2026. The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean). Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil. 9, 1 (Mar. 2026), 53–58. DOI:https://doi.org/10.25139/jprs.v9i1.11062.