(1)
Tistogondo, J.; Kurniawan, F. B.; Restuti Wulandari, D. A. The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean). Ge-STRAM J. Perenc. dan Rekayasa Sipil. 2026, 9, 53-58.