Perencanaan Ulang Pada Jembatan Flyover Aloha Sidoarjo Dengan Menggunakan Concrete Segmental Box Girder Di STA 0+420 – STA 0+450: Case Study of the Aloha Flyover Bridge in Sidoarjo at STA 0+420 – STA 0+450. (2025). Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 8(2), 111–116. https://doi.org/10.25139/jprs.v8i2.10773