The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean). (2026). Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 9(1), 53–58. https://doi.org/10.25139/jprs.v9i1.11062