The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean). Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, [S. l.], v. 9, n. 1, p. 53–58, 2026. DOI: 10.25139/jprs.v9i1.11062. Disponível em: https://ejournal.unitomo.ac.id/index.php/gestram/article/view/11062. Acesso em: 17 jun. 2026.