“The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean)”. 2026. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil 9 (1):53-58. https://doi.org/10.25139/jprs.v9i1.11062.