“The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)” (2026) Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, 9(1), pp. 53–58. doi: 10.25139/jprs.v9i1.11062.