“The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean)”. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, vol. 9, no. 1, Mar. 2026, pp. 53-58, doi:10.25139/jprs.v9i1.11062.