“The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200 200 U-Ditch Channel With 10 Ton Axle Cover on Jl. Simo Kwagean)”. Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil 9, no. 1 (March 30, 2026): 53–58. Accessed June 17, 2026. https://ejournal.unitomo.ac.id/index.php/gestram/article/view/11062.