The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean): Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean). Ge-STRAM J. Perenc. dan Rekayasa Sipil. [Internet]. 2026 Mar. 30 [cited 2026 Jun. 17];9(1):53-8. Available from: https://ejournal.unitomo.ac.id/index.php/gestram/article/view/11062