Perencanaan Tebal Perkerasan Jalan Sergang – Jembatan Jengkong (No. 243) KM 8 Batu Putih Kabupaten Sumenep

  • Universitas Wiraraja
  • Universitas Wiraraja
Abstract views: 269 , PDF downloads: 320
Keywords: Pavement, Flaxible Pavement Sergang Batu Putih Street, Budget Plan

Abstract

The white stone mine in Batu Putih Village is one of the natural resources located in Sumenep Regency, precisely on Sergang Street - Jengkong Bridge No. 243 Km 8. This road is the only access road to the white stone mining. The current condition of the road is damaged and interferes with the distribution process of white stones, so good thick pavement planning is needed. Planning of flexible pavement thickness and the cost of flexible pavement construction on Sergang - Jengkong Bridge No. 243 Km 8 Batu Putih, Sumenep Regency uses quantitative research. The data collection process uses two types of data, the first is primary data which includes LHR data and the second is secondary data which includes literature and literature studies. In this research the data analysis technique uses Microsoft Office Excel which is to calculate the budget plan and Autocad for drawing. For calculation procedures adjusted to SNI -1732-1989. The results of the Average Daily Traffic Survey (LHR) obtained the total number of vehicles passing through by 21164 smp. The road to be planned is 3 Km long and 4 m wide. Calculation of pavement thickness using the laston AC-WC is 2.50 cm thick and will be planned to be 4 cm thick. The planned budget (RAB) for the road planning is Rp. 2,613,171,000.00 (two billion six hundred thirteen million one hundred seventy-one thousand rupiah).

References

Sukirman, Silvia. 2010. perencanaan tebal struktur perkerasan lentur. Bandung : Nova.
Oglesby, Clarkson H. R Gary Hicks. 1999. teknik jalan raya. Jakarta : Erlangga
Sukirman, Silvia. 1999. Perkerasan lentur jalan. Bandung : Nova.
Saodang MSCE, IR. Hamirhan. 2005. Konstruksi jalan raya. Bandung : Nova
Yasruddin. 2011. Perencanaan tebal perkerasan lentur ruas jalan paringan muara pitap kabupaten balangan. Info teknik. Volume 12 No. 1.
Departemen pekerjaan umum. 1987. Petunjuk perencanaan tebal perkerasan lentur jalan raya dengan metode analisa komponen. Yayasan badan penerbit PU.
Ir. Suprapto Tm, M.Sc. 2004 Bahan Dan Struktur Jalan Raya. KMTS FT UGM
Pedoman penyusunan skripsi. 2018. Universitas wiraraja Sumenep.
Diah Oktami, Leni Sriharyani. 2016. Kajian penggunaan Dynamic Cone Penetrometer (DCP) untuk uji lapangan pada tanah dasar pekerjaan timbunan (studi kasus di Bandar udara radin inten II lampung). Tapak. Volume 5 No. 2.
Prisa Immakulata Lesi Lengkong. 2013. Hubungan nilai CBR laboratorium dab DCP pada tanah yang di padatkan pada ruas jalan wori likupang kabupaten minahasa utara. Jurnal sipil static. Volume 5 No.5 ISSN: 2337-6732.
Sugiono. 2010. Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung : Afabeta
Pelatihan road design engineer. 2005. Modul RDE – 10: perencanaan geometric jalan. Departemen pekerjaan umum badan pembinaan konstruksi dan sumber daya manusia pusat pembinaan kompetensi dan pelatihan konstruksi (PUSBIN-KPK).
Published
2019-09-30
How to Cite
, & . (2019). Perencanaan Tebal Perkerasan Jalan Sergang – Jembatan Jengkong (No. 243) KM 8 Batu Putih Kabupaten Sumenep. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 2(2), 89-93. https://doi.org/10.25139/jprs.v2i2.1963
Section
Articles