Probabilitas Perpindahan Penumpang Transportasi Massal Berbasis Rel (Studi Kasus Kereta Api Argo Parahyangan Terhadap Kereta Cepat Jakarta – Bandung)

  • Universitas Pertamina
  • Universitas Pertamina
  • Universitas Pertamina
Abstract views: 260 , PDF downloads: 444
Keywords: Time Different, Cost Different, High Speed Rail, Binary Logit Biner, Revealed Preference

Abstract

The high mobility of the community in the Jakarta - Bandung corridor, caused a surge in passengers of Argo Parahyangan Train. To overcome this, the Government of Indonesia is carrying out a National Strategic Project, by building the Jakarta - Bandung High Speed Rail which takes only 36-44 minutes. When the Jakarta - Bandung bullet train starts operating, there will be passengers transfer from Argo Parahyangan Train to Jakarta - Bandung High Speed Rail. To find out how many passengers will move from Argo Parahyangan Train to Jakarta Bandung High Speed Rail, this research surveyed with revealed preference technique, then the data analyzed with binary logit method. The travel attributes used in this study are the time difference and cost different. The results in this study, as many as 97.67% and 97.97% will move from Argo Parahyangan Train to High Speed Rail if the time difference is faster 150 and 165 minutes with a higher cost of Rp 25,000. By the cost is more expensive which is Rp 200,000, as much as 12.9% of participants select move to the High Speed Rail if the travel time is faster 150 minutes and about 14.59% select move to the High Speed Rail if the travel time is faster 165 minutes.

References

Hanifah, S., 2016. Jembatan Cisomang Retak, Masyarakat Buru Tiket Kereta Ke Bandung, s.l.: merdeka.com.

Nurhasanah, F., 2021. Analisis Perpindahan Moda Pengguna Transjakarta Terhadap Moda MRT Fase II (Studi Kasus Transjakarta Koridor 1). Laporan Tugas Akhir.

Nurhidayat, A. Y., Widyastuti, H. & Utomo, D. P., 2018. Model of transportation mode choice between aircraft and high speed train of Jakarta-Surabaya route. Surabaya, IOP:Conf.Series : Earth and Environment Science.

Putri, A. L., 2019. Studi Willingness To Pay pengguna Kereta Api Travel dan Bus Yang Akan Berpindah Menggunakan Kereta Cepat Jakarta - Bandung Sebagai Bahan Pertimbangan Tarif. Tesis, p. 357.

Putri, A. L. & Widyastuti, H., 2019. Study of willingness to pay the Jakarta-Bandung highspeed train : a case study of Argo Parahyangan train passangers. Jakarta, IOP Conf. Series: Materials Science and Engineering.

Tamin, O., 2000. Perencanaan & Pemodelan Transportasi. Bandung: ITB.

Tuhepaly, R. S. S. & Widyastuti, H., 2019. Analisis Probabilitas Pemilihan Moda Pesawat Terbang dan Kapal Laut pada Rute Fakfak Sorong dengan Metode Revealed Preference. Jurnal Aplikasi Teknik Sipil, Februari, 17(1), pp. 13-18.

Utami, A., 2019. Model Panjang Antrian Kendaraan pada Perlintasan Sebidang Tanpa Palang Pintu (Studi Kasus: Perlintasan Sebidang Jl. Gayung Kebonsari Surabaya). Jurnal Aplikasi Teknik Sipil, Februari, 17(1), pp. 27-34.

Utami, A. & Widyastuti, H., 2020. STUDY OF SOCIETY BEHAVIOUR TO EARLY WARNING IN THE RAILWAY LEVEL CROSSING WITHOUT BARRIER IN GAYUNG KEBONSARI, SURABAYA. Majalah Ilmiah Pengkajian Industri, April.pp. 39-46.

Widyastuti, H., Utami, A. & Dzulfiqar, Z. M., 2019. Model of queuing in the railway level crossing (case study: Imam Bonjol railway level crossing in Blitar). Jakarta, IOP Conf. Series: Materials Science and Engineering.

Published
2021-10-30
How to Cite
, , & . (2021). Probabilitas Perpindahan Penumpang Transportasi Massal Berbasis Rel (Studi Kasus Kereta Api Argo Parahyangan Terhadap Kereta Cepat Jakarta – Bandung). Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 4(2), 91-96. https://doi.org/10.25139/jprs.v4i2.4056
Section
Articles