Analisis Produktivitas Alat Berat Proyek Pembangunan Jalur Ganda Kereta Api

  • Siti Choiriyah Choiriyah Institut Teknologi Adhi Tama Surabaya
  • M.Ferdaus Noor Aulady Aulady Institut Teknologi Adhi Tama Surabaya
  • Felicia Tria Nuciferani Institut Teknologi Adhi Tama
  • Diah Listyaningsih Listyaningsih Institut Teknologi Adhi Tama Surabaya
  • Alfani Subhan Subhan Institut Teknologi Adhi Tama Surabaya
Abstract views: 18 , PDF downloads: 38
Keywords: Adhi Tama Institute Of Technology Surabaya, Duration, Machine Weight, Productivity

Abstract

The mojokerto - along double railroad construction project certainly requires a good and strong and ideal subgrade, so that in the process of work required soil reinforcement work. The heavy equipment used is excavator, excabreaker, dump truck, and vibrator roller. This study aims to determine the productivity and cost of heavy equipment working in the field. The occurrence of delays in the rail piling work makes this work exceed the planned time limit. The method used in this research is a quantitative method, namely by collecting the required data. To overcome the delay, the addition of heavy equipment is analyzed with a choice of 4 options. Based on the analysis, the best option is to use 2 excabreaker units at a cost of Rp 191,089. 940.00 on rail piling work because it is more effective and efficient. The results of the analysis based on the productivity of heavy equipment working in the field, soil reinforcement work can be completed within 25 days and a total cost of Rp 732,746,726.00. Thus the soil reinforcement work can be completed in accordance with the planned time.

References

Ainurrizki Muliddiyah. (2019). Analisis Produktivitas Dan Kombinas Alat Berat Pada Pekerjaan Galian Di Proyek Pembangunan Reffinary Di PT. SALIM IVOMAS PRATAMA, TBK. Julrulsan Teknik Sipil Institut Teknologi Adhi Tama Surabaya.

Akbar, F., Yamali, F. R., & Dwireltnani, A. (2021). Analisa Pelngulnaan dan Produlktivitas Alat Belrat pada Kelgiatan Pelningkatan Rulas Jalan Simpang Paulh – Air Hitam Provinsi Jambi. Julrnal Talelnta Sipil, 4(2), 114. https://doi.org/10.33087/talelntasipil.v4i2.57

Buldi Listyawan, A., Nulr Sahid, M., Slamelt Mullyono, G., & Khairulrizal Fadhlulllah, H. (2021). Analisis Produlktivitas Alat Belrat Dan Biaya Pelkelrjaan Pelmindahan Tanah Pada Pelmbangulnan RSUlD Pondok Areln..Tanggelrang..Sellatan. https://joulrnals.ulms.ac.id/indelx.php/DTS/articlel/vielw/15272/6793

Felbrianti, D., Zakia, Z., & Mawardi, El. (2021). Analisis Biaya Opelrasional Alat Belrat pada Pelkelrjaan Timbulnan. Tamelh: Joulrnal of Civil Elnginelelring, 10(1), 33–41. https://doi.org/10.37598/tamelh.v10i1.131

Janizar, S., Hadi Abdulllah, F., & Winaya Mulkti, Ul. (2023). Elfisielnsi Waktul Dan Biaya Dalam Pelnggulnaan Alat Belrat Pada Pelkelrjaan Pelmelliharaan Ovelrlay Rulas Tol Cipullarang Jalulr A. Telknik Sipil.

Kulrniawan, S., & Nulzola, rulf. (2021). Analisisi Produlktivitas Galian/Timbulnan Melnggulnakan Alat Belrat Pada Pelmbangulnan Belndulngan Margatiga Lampulng Timulr (Vol. 11, Issulel 1). http://ul.lipi.go.id/1320332466

Mulhanas. (2021). Analisis Produlktivitas Alat Belrat Pelkelrjaan Gali-Mulat Pada Pelmbangulnan Baselmelnt Balai Pelmulda Kota Sulrabaya. Julrulsan Telknik Sipil Institult Telknologi Adhi Tama Sulrabaya.

Priyo S Adit. (2022). Analisis Pelrhitulngan Waktul dan Biaya Pelkelrjaan Galian..Tanah..Telknik..Sipil,..15,..14–21. https://julrnal2.ulntagsmg.ac.id/indelx.php/jts/articlel/vielw/33

Sangadji, M. I., Rizky Ahadian, El., & Darwis, M. (2021). Analisis Produlktivitas Waktul Kelrja Alat Belrat Pada Pelmbangulnan Lanjultan Relklamasi Dan Jalan Kawasan Kayul Melrah-Kalulmata (Vol. 4, Issulel 1).

http://eljoulrnal.ulnkhair.ac.id/indelx.php/josael

Sulsila Helrman, M. El. J. W. (2022). Analisis Produlktivitas Dan Kelbultulhan Alat Belrat. Julrnal Telknik Sipil Dan Arsitelktulr, 27. http://eljoulrnal.ultp.ac.id/indelx.php/JTSA/articlel/vielw/2161

MElNTElRI TElNAGA KElRJA DAN TRANSMIGRASI RElPUlBLIK INDONElSIA. (2023). MElNTElRI TElNAGA KElRJA DAN TRANSMIGRASI RElPUlBLIK INDONElSIA KElPUlTUlSAN MElNTElRI TElNAGA KElRJA DAN TRANSMIGRASI RElPUlBLIK INDONElSIA. https://jdih.kelmnakelr.go.id/asselt/data_pulul/pelratulran_filel_186.pdf

Published
2024-03-30
How to Cite
Choiriyah, S. C., Aulady, M. N. A., Nuciferani, F. T., Listyaningsih, D. L., & Subhan, A. S. (2024). Analisis Produktivitas Alat Berat Proyek Pembangunan Jalur Ganda Kereta Api. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 7(1), 51-58. https://doi.org/10.25139/jprs.v7i1.7879
Section
Articles