Pembangunan Saluran Drainase Serta Metode Pekerjaan Pada Proyek Radial Road Kelurahan Lontar Kecamatan Sambikerep Kota Surabaya
DOI:
https://doi.org/10.25139/jprs.v8i1.9674Keywords:
Drainage, Infrastructure, Building, Work Methode, U-DitchAbstract
Infrastructure development creates development in an area in the sector that is needed, such as the conversion of vacant land. The change of land use from forests to residential areas. commercial, industrial can significantly affect the water discharge of existing channels. The transfer of land functions requires infrastructure that can connect from one place to another, such as the construction of road network facilities. The Surabaya City Government through the Surabaya City Water Resources and Highways Office provides facilities such as Radial Road infrastructure in Lontar Village. The construction of new road infrastructure requires an adequate drainage system so that the road minimizes the emergence of various problems. Good drainage can help drain rainwater effectively, thereby reducing the risk of waterlogging and property damage. The purpose of this study is to find out the drainage channel work method carried out in this project. The researcher observed directly and took documentation to the field. Researchers also utilize literature, interviews, and data from companies to support research needs. So that the drainage channel construction work method is produced according to the project work plan. The observation results were obtained by the methods of scavenging work, earthworks, and installation work. There are Double U-Ditch Box materials type 150x150x120 cm fc'30 MPa, U-Ditch 150x150x120 cm fc'30 MPa, U-Ditch 40x60x120 cm fc'30 MPa, U-Gutter type 30x20x60 cm for water drainage, and Concrete Buis size 100x100x10 for infiltration wells needed in the construction of drainage channels in the Radial Road project.
References
E, H. (2022). Buku Teknik Sipil. Retrieved from Apa Itu Drainase dan Sistem Drainase, Simak Penjelasannya: https://www.gramedia.com/best-seller/drainase-2/?srsltid=AfmBOoogzyevRETj3QD6MGS6Bogt8HMYxE9LUDLkcfAYqHrjzR5H-KFZ#google_vignette
News. (n.d.). Retrieved from Pengertin Buis Beton Beserta Fungsinya: https://asiacon.co.id/blog/pengertian-buis-beton-adalah-fungsi
Precast Box & Culvert Guideline. (2016). The Ontario Concrete Pipe Association. Retrieved from https://ccppa.ca/wp-content/uploads/2018/11/PrecastBoxCulvertGuideline_final_draft.pdf
Ridwan, M. (2022). Analisis Sistem Saluran Drainase Untuk Menanggulangi Banjir Di Area Perumahan Grand Azizi Kota Padang Panjang. Universitas Muhammadiyah Sumatera Barat, Teknik Sipil. Retrieved from http://eprints.umsb.ac.id/716/1/MUHAMMAD%20RIDWAN%20181000222201094.pdf
Suratmi, Zainal, I., Tri Rahayu, S., & Royani, E. (2023). Metode Pelaksanaan Pekerjaan Saluran Drainase Box Culvert. (D. Febrikawati Ratna Dhahita, Ed.) CV. Amerta Media. Retrieved Desember 6, 2024, from https://www.researchgate.net/publication/369749479_Metode_Pelaksanaan_Pekerjaan_Saluran_Drainase_Box_Culvert
Suyanto. (2008). Drainase Saluran Tertutup Pada Jalan Raya. Retrieved Desember 6, 2024, from https://repositori.uma.ac.id/jspui/bitstream/123456789/22484/1/068110065%20-%20Suyanto%20Fulltext.pdf
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.