Evaluasi Pekerjaan Geser Lengkung Jalur Kereta Api (Studi Kasus: Lengkung Nomor 11 Km 8+303 Sampai Km 8+484 Wonokromo Surabaya)
Abstract
Planning railroad geometry is planned based on the speed of the train that will pass through the railroad. One of the railroad geometries is straight and curved roads or the horizontal alignment of railroads. The railroad track consists of straight lines and curved lines. The straight line allows trains to run according to operational speed. On a curved track, the train has the possibility of lowering its speed due to the condition of the curved track with a certain height and radius. Therefore, it is necessary to do a good job and in accordance with the work plan. The formulation of the problem of this research is how the data analysis techniques in curved shear work; what is the procedure for carrying out curved shear work; and what is the follow-up and the results of the implementation of the curved shift. The purpose of this study is to determine the impact of curved shear work on the motion of the train. This research method was carried out based on PD No. 10 of 1986 PT Kereta Api Indonesia (Persero). The research location is at arch number 11 KM 8+303 to 8+484 Wonokromo Surabaya. The curved shear work and bend inspection were carried out based on PT Kereta Api Indonesia (Persero) operational standards in 2019. From the curved shear work, it is planned to change the bend radius from 450 m to 350 m. The results of the inspection of the bends after the curved shearing work obtained a curved radius of 350 m, a height of 109, an average AP of 143 and a speed of 80 km/hour.
References
Kristian,Yusup & Roesdiana, Tira. (2016).”Pengaruh Geometrik Jalan Rel Terhadap Batas Kecepatan Maksimal Kereta Api”. Jurnal Konstuksi, Vol.V, No. 1, Januari 2016. Jurusan Teknik Sipil UNSWAGATI, Cirebon.
Peraturan Dinas Nomor 10 Tahun 1986 PT Kereta Api Indonesia. Perawatan Jalan Rel dengan lebar 1.067 mm.
Peraturan Dinas Nomor 10A Tahun 1987 PT Kereta Api Indonesia.
Peraturan Menteri Perhubungan Nomor 60 Tahun 2012. Persyaratan Teknis Jalur Kereta Api.
Standar Operasional Prosedur PT Kereta Api Indonesia (Persero). (2019). Pemeriksaan dan Perawatan Jalan Rel. Unit Track and Birdge.
Copyright (c) 2023 R Endro Wibisono, Ade Irma Irjayanti
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.