Analisis Kecelakaan Kerja Menggunakan Metode Fault Tree Analysis (FTA) Pada Pelaksanaan Konstruksi Pembangunan Industri Makanan Di Kabupaten Gresik

  • R Endro Wibisono Universitas Negeri Surabaya
  • Farida Hardaningrum Universitas Narotama Surabaya
  • Doni Ndito Palupi Universitas Narotama Surabaya
Abstract views: 157 , PDF downloads: 265
Keywords: Occupational Safety and Health (OHS), Fault Tree Analysis (FTA), Work Productivity

Abstract

Work accidents are something that often happens on construction projects and deserve attention. The most difficult thing is to determine the root of the problem. The method used in this research is to look for the causes of work accidents, namely the Fault Tree Analysis (FTA) method. The FTA method is one way to resolve cases when failure or undesirable things occur by looking for the root of the problem from the basic events that arise and is described from each indication of the incident. This is done by identifying the relationship between causal factors and displaying it in the form of a fault tree which involves a simple logical "tree". Accidents are calculated for every 1,000,000 working hours of the worker's total "hours worked". The safe T value is a measurement that aims to compare the results of the level of accident reduction achieved for that work. The research results show that work accidents have an effect on work productivity. As a result of data processing and analysis, it was found that the occupational safety and health implementation program at PT. Sejahtera Asia Mulia can be said to have been implemented quite well. The accidents that occurred in 2020-2022 were 16, 13 and 7 accidents. The frequency level from 2020-2022 is 101.59; 71.15; 29.76. The severity level that occurred in 2020-2022 was 4844.44; 3409.96; 1785.71. Safe T value in 2021 is known to be -0.427 and in 2022 was -1.390. The decreasing rate of accidents and the severity of accidents from year to year indicates an increase in labor productivity.

References

Kerja Berdasarkan Metode Fault Tree Analysis Pada Area Packing Semen Di PT. Lafarge Cemen Lhokseumawe. Aceh Utara: Jurnal Sistem Teknik Industri

Bennet, N. &. (1995). Manajemen Keselamatan dan Kesehatan Kerja. Jakarta: Bina Rupa Aksara

Budihardjo, d. (2017). Pengaruh Keselamatan Kerja, kesehatan kerja, dan Lingkunan kerja Terhadap Produktivitas Pekerja PT. Air manado. Jurnal EMBA Vol 5 No 3

Dameyanti Sihombing, d. (2014). Implementasi Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Di Kota Bitung (Studi Kasus Proyek Pembangunan Pabrik Minyak PT. MNS). Kota Bitung: Jurnal Sipil Statik Vol.2 No.3, Maret 2014 (124-130) ISSN: 2337-6732

Ervianto, W. I. (2005). Manajemen Proyek konstruksi. Yogyakarta: Andi. Hillebrandt, P. N. (1985). Economic Theory and The Construction Industri. London: Second Edition, Macmillan Press.

Ibrahim, J. K. (2010). Pelaksanaan Program K3 Pekerja PT. Biratex Industries Semarang. Semarang: Universitas Diponegoro.

ILO. (1989). Pencegahan Kecelakaan, Seri Manajemen. Jakarta: Cetakan Pertama. PT.Pustaka Binaman Pressindo. Javadi1, S. M. (2011). Fault Tree Analysis Approach in Reliability Assessment of Power System. Australia: http://www.ijmse.org/Volume2/Issue6/paper9.pdf.

Jeremy, S. (2006). The Health & Safety Handbook. Great Britain: Cambrige: University Press.

Moekijat. (2010). Manajemen Sumber Daya Manusia. Bandung: Cetakan Kesembilan. Notoadmodjo, S. (2003). Pendidikan Dan Perilaku Kesehatan. Jakarta: Rineka Cipta.

Nurdin, L. (2017). Identifikasi Bahaya Penilaian Risiko Dan Pengandalian. Yogyakarta: Sibima. 72 OHSAS. (18001:2007). Occupational Health and Safety Management System

Pangkey dkk. (2012). Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Proyek Konstruksi di Indonesia (Studi Kasus:Pembangunan Jembatan Dr. Ir. Soekarno-Manado). Manado: Jurnal Ilmiah Media Engineering 100-113.

Reason, J. T. (1997). Managing The Risk Of Organizational Accidents. Hants: Ashgate Piblishing Ltd. Aldeshot.

Published
2024-09-12
How to Cite
Wibisono, R. E., Hardaningrum, F., & Palupi, D. N. (2024). Analisis Kecelakaan Kerja Menggunakan Metode Fault Tree Analysis (FTA) Pada Pelaksanaan Konstruksi Pembangunan Industri Makanan Di Kabupaten Gresik. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 7(2), 129-133. Retrieved from https://ejournal.unitomo.ac.id/index.php/gestram/article/view/8769
Section
Articles

Most read articles by the same author(s)